Tuesday, August 30, 2011

Framing Day #5

The second half of our roof was delivered (sure is nice to have the factory just 30 minutes from our house) before lunch.  They were able to finish the roof today and put up the windows and doors.  Tommorow we get shingles put on...they are already sitting on our roof just waiting to be laid down.

My husband was able to walk through today and found that the floor by the front door squeaks.  Also, he found that the top of the stairs on the right side is 1/2 inch higher than the left, and squeaks too.  Wasn't noticeable until the window at the top of the stairs was put in.  So he will be calling our PM in the morning to have those items fixed.  Kudos to our knowledgable new neighbor who walked through with him (we have no construction experience)!